80. What to do for on-site anomalies: oversize, power failure or poor securing?

80. What to do for on-site anomalies: oversize, power failure or poor securing?

Report it immediately and arrange on-site handling at the same time: for a measuring anomaly, re-measure under supervision and refuse to sign the anomalous document; for a power-on anomaly, first diagnose the cause (recharge, deactivate transport mode, deal with the auxiliary battery); for inadequate securing, require the operator to rectify and re-secure. Keep records of every exception-handling step and report back, releasing the vehicle for loading only after the issue is fully closed out.