113. What covers the full front-end risk control for heavy-lift generator set transport?
- Share
- Issue Time
- Oct 30,2026
For EPC contractors and foreign-trade factories shipping generator sets, the complete front-end risk-control process focuses on avoiding risk: verify the full equipment data; calculate the centre of gravity and design the stowage plan; carry out a specialist assessment of out-of-gauge and overweight issues; notify the shipowner 15 days in advance; handle terminal and maritime authority approvals; tailor the shock-absorbing, sealing and lashing/reinforcement plan; supervise loading at the port of departure; track the shipment throughout the ocean voyage; and match a handling plan for the destination port. This covers the whole chain and avoids rejection, delay, cargo damage, lifting failure and other ocean-freight problems.